Laying tiles, repair, finishing works

The publication of texts, photos and illustrations of this website without the author’s validation is strictly prohibited.

© www.mdhouses.ch

Laying tiles on the outdoor terrace is done after the base is completely dry. Depending on the use of materials and technology of applying waterproofing, the polymerization process can take from 3 to 7 or more days.

Laying tiles made of ceramics (clinker tiles), porcelain stoneware or natural stone (with a stable structure) is performed on elastic adhesives.

The choice of glue depends on the material from which the tile is made, the type of tile and the format of the tile. The choice of glue is also influenced by the time which was taken for the tile laying work and the conditions for the subsequent operation of the coated surface.

More